|
Location:
|
Cranbrook
Grammar School, Cranbrook, Kent |
|
Commercial
Requirement:
|
Replacement
frames for two school buildings providing residential accomodation
to students |
|
Crittall
Recommendation:
|
Replace
original, single glazed aluminium vertical sliders |
|
Detail:
|
Existing
windows no longer offer adequate installation |
|
Material
Requirement:
|
Virtually
maintenance free PVC-U |
|
Design
Requirement:
|
Eliminate
draughts and look to significantly improve both thermal and noise
insulation |
|
Product
Requirement:
|
Goldline
PVC-U top-hung, double-glazed casements |
|
Construction:
|
Building
constructed of brick with aluminium cladding to the upper storeys |
|
Result:
|
Double
Glazed frames have been fitted to almost all the windows in the
two buildings. Crittall Installation Services has now worked with the school
on a number of properties. |